|
There are 0 registered users online.
|
|
|
|
|
|  |
GRACE Monthly Report from March 2015 is available
The GRACE Science Data System Monthly Report from March 2015 is available now. For Details see:
SDS Monthly Report March 2015.
Note: Highlights this month:
* A 2-days orbit repeat cycle caused problems to calculate nominal Level-2 products for March 2015 (see also newsletters of January and February 2015 and GRACE ground track plots available at http://www.gfz-potsdam.de/en/grace). The SDS has worked on solution stabilization strategies resulting in the products as described in the following.
* CSR has generated and delivered following RL05 Level-2 products for March 2015 (Please refer to the corresponding notes on the CSR website and to the CSR L2 Release Notes):* A standard 60x60 solution where more aggressive than normal post-processing may be required.
* Additionally, a deviant 60x30 product for experimental use is provided too.
* No 96x96 solution will be generated and delivered.
* GFZ has generated and delivered following RL05a Level-2 products for March 2015 (see also GFZ L2 Release Notes):* A standard 90x90 solution where more aggressive than normal post-processing may be required.
* Additionally, a deviant 90x30 product for experimental use is provided too.
* JPL has generated and delivered following RL05.1 Level-2 products for March 2015 (see also JPL L2 Release Notes):* A standard 60x60 solution where more aggressive than normal post-processing may be required.
* The next GRACE Science Team Meeting is scheduled for September 21-23, 2015 in Austin. Further information will follow on the GSTM website at CSR at http://www.csr.utexas.edu/grace/GSTM/ .
|
|
 |
|
Personal Block  |
|
|
You are not logged in. |
|
|
|
|
|
Request Limits (24h)  |
|
|
You are not logged in. |
|
|
|
|
|